HOSAPRO · PaintWorks0%
Painting & Decorating · Singapore60 Paya Lebar Road, #06-28 Paya Lebar Square+65 8810 4527
Spec No. 01 — Painting & Decorating

Professional finishes, built to last.

HOSAPRO PaintWorks prepares, paints and finishes Singapore homes and commercial spaces with workshop-level care — from patching the first crack to the final coat.

Painting services
Layer system
Property types
Wall before repainting with peeling paint
Same wall freshly repainted
BeforeAfter
⟷
Drag to compare
Interior PaintingExterior & FacadeHDB RepaintingLanded HomesCommercialFeature WallsWallpaperSurface Repairs Interior PaintingExterior & FacadeHDB RepaintingLanded HomesCommercialFeature WallsWallpaperSurface Repairs
HOSAPRO painters preparing a wall
About the workshop

Craft first. Paint second.

At HOSAPRO PaintWorks we treat every wall like a workpiece. We inspect, repair and prime before a drop of topcoat goes on — because a finish is only as good as what's underneath.

01Inspect & measureEvery surface checked for cracks, damp and peeling before we quote.
02Protect everythingFloors, furniture and fittings covered and masked.
03Right product, right surfacePrimers and paints matched to walls, ceilings, timber and metal.
04Inspect againA final walk-through with you before we pack up.
Finish Finder

Which sheen suits the room?

Paint sheen affects how a wall looks, how easy it is to clean and how well it hides imperfections. Pick a room to see the finish we usually recommend.

SUBSTRATE
FILLER / REPAIR
PRIMER / SEALER
TOPCOAT 1
TOPCOAT 2
Our coat system · scroll
Layer 0

The substrate

Every job starts with the wall itself — plaster, concrete, board, timber or metal. We check it for cracks, damp and loose paint.

Layer 1

Filler & repairs

Cracks and holes filled, peeling paint scraped and sanded so the surface is sound and smooth.

Layer 2

Primer / sealer

Primer helps the topcoat grip, evens out absorbency and seals patched areas for a uniform finish.

Layer 3

First topcoat

The first coat of colour builds coverage. We cut in edges first, then roll for an even surface.

Layer 4

Second topcoat

The second coat gives full, consistent colour and durability — applied after the right drying time.

Process

From survey to sign-off

Four clear stages, with your approval at every step.

01i.

Site survey

We inspect and measure, discuss colours and finishes, then send a written quotation.

02ii.

Preparation

Protect, mask, repair, sand and prime — the work that makes the finish last.

03iii.

Application

Topcoats applied evenly with proper drying time between coats.

04iv.

Inspection

Touch-ups, clean-up and a final walk-through together before handover.

FAQ

Common questions

Yes. We inspect the surfaces, take measurements and send you a written quotation with no obligation.

Paint only sticks as well as the surface beneath it. Filling, sanding and priming helps the finish look smooth and last longer.

Yes. For commercial spaces we can schedule evening or weekend work to minimise disruption.

No. We move items to the centre of each room and cover them, along with your floors.

Contact

Open a work order

Tell us about the job and we'll arrange a site survey.

Painting supplies loaded and ready for a job
Address60 Paya Lebar Road, #06-28 Paya Lebar Square, Singapore 409051
UEN202648826C